<< Click to Display Table of Contents >> Report Configuration Files |
This chapter lists the workflows and how the Report Configuration Files and it Layout files are handled in a Collaboration (BIM360 / Autodesk Construction Cloud) environment.
This chapter is important only if the Report Files Location is set to Project (see AutoCAD Plant 3D).
Creating a new Report Configuration
If you create a new Report Configuration the following files are handled: 1.ReportConfiguration.Collection.xml = CHECKED OUT |
Editing a Report Configuration
If you edit a Report Configuration the following files are handled: 1.*.rcf file => CHECKED OUT 2.*.layout.22.2 => CHECK OUT 3.ReportConfiguration.Collection.xml = CHECKED OUT |
Closing Report Configuration Dialog
If you close the Report Configuration Dialog the following files are handled: 1.*.rcf file => CHECKED IN 2.*.layout.22.2 => CHECK IN 3.ReportConfiguration.Collection.xml = CHECKED IN |
Deleting a new Report Configuration
If you delete a Report Configuration the following files are handled: 1.*.rcf file => DELETED 2.*.layout.22.2 file => DELETED 3.ReportConfiguration.Collection.xml = CHECKED OUT/IN |
Importing Report Configurations
If you import a Report Configuration the following files are handled: 1.*.rcf file => CHECKED IN 2.*.layout.22.2 file => CHECKED IN 3.ReportConfiguration.Collection.xml = CHECKED OUT/IN |